AI and HPC data centre campus near El Dorado, Arkansas, featuring immersion cooling and 8MW of current capacity with plans to expand to 150MW for AI and high-performance computing workloads.
The Paradox Data Union County Campus is an AI and high-performance computing (HPC) data centre facility located outside El Dorado, Arkansas, within Union County. The site was acquired by Z Squared Inc., a Nasdaq-listed digital infrastructure firm, as part of a strategic pivot from cryptocurrency mining toward AI and HPC workloads. The 10-acre campus is purpose-built for high-density computing, utilising advanced full-immersion liquid cooling to support the extreme thermal demands of modern AI accelerator hardware.
The facility currently delivers 8MW of operational power capacity, with plans to scale significantly through a combination of utility grid connectivity and behind-the-meter natural gas generation. Z Squared has stated its intention to develop the campus to approximately 150MW total capacity across a 170-acre footprint, positioning it as a major AI infrastructure hub in the South-Central United States.
Union County offers strategic advantages including competitive energy costs, available land for campus expansion, and proximity to regional natural gas infrastructure. The Paradox Data Union County Campus is designed to accommodate the next generation of AI training and inference workloads, offering immersion-cooled high-density racks, scalable power infrastructure, and direct utility interconnection to serve hyperscale and enterprise AI computing customers.