Viridien data centre in Brenham, Texas — 45 MW (Proposed).
Data centre facility operated by Viridien in Washington County, Brenham, Texas. Power capacity: 45 MW. Facility size: 40,000 sq ft. Property: 21 acres. Cooling: Closed loop. Power source: Grid (unspecified mix), Solar. Status: Proposed.