Vantage DUB1 Data Centre Campus - Grange Castle, Dublin
Vantage €1bn DUB1 campus at Grange Castle, Dublin: 52MW across two phases, on-site multi-fuel power generation.
Vantage Data Centers is investing €1 billion ($1.07bn) in its DUB1 campus at Profile Park, Grange Castle, Dublin, Ireland. Located nine miles south of Dublin city, the 22-acre site will offer 52MW of IT capacity across two phases: a 32MW first phase and a 20MW second phase. The 405,000 sq ft (38,000 sqm) campus has a PUE target of 1.2 and uses virtually no water for cooling. It includes an on-site 100MVA multi-fuel generation plant running on hydrotreated vegetable oil (HVO) and gas. Phase one was expected to be operational by end of 2024.