Opened in January 2010, JB1 East, the Johannesburg colocation data centre facility was originally set over 1250sqm. Subsequent growth in the market and demand for carrier neutral colocation resulted in further expansion phases that increased the data centre floor space in JB1 East to over 3850sqm and the building of a second facility, JB1 West, which houses over 5000sqm of data centre floor space. A total of 20MVA of power is supplied to the site. Opening February 2020
60 MVA, 12000 sqm catering for both interconnection and wholesale hyperscale requirements